Timing of Devon switchoff ‘could not be worse’, says board, as members face an estimated £2m in lost revenue

  • ikt@aussie.zone
    link
    fedilink
    arrow-up
    6
    ·
    5 days ago

    That is insane and makes me wonder if it’s stupid as well, are they not capable of monitoring the lines voltage and shutting down if required on demand instead of the entire summer?

    That’s such a fuckup I can’t believe it